TM 55-1945-205-24-4
0110 00 1
0110 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
PERSONNEL SHELTER INCINERATOR TOILET
EXHAUST FLEXIBLE COUPLINGS
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 54, WP 0253 00)
Materials/Parts
Coupling, Pipe
(81340)
PN 4511K81
Coupling, Pipe
(81340)
PN 4511K82
Qty 2
Pipe, Plastic
(81340)
PN 93908
Personnel Required
Utilities Equipment Repairer 52C
REMOVE PERSONNEL SHELTER INCINERATOR TOILET EXHAUST
FLEXIBLE COUPLINGS
1.
Loosen stainless steel band (1) between the flex reducing coupling (2) and the incinerator toilet 90° elbow (3) and
slide band (1) onto elbow (3).
2.
Loosen stainless steel band (4) between the flex reducing coupling (2) and the straight 3 in. PVC pipe (5) and slide
band (4) onto pipe (5).
3.
Remove flex reducing coupling (2) and discard.
7
9
5
2
3
1
4
6
8