Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
REMOVE PERSONNEL SHELTER FLUORESCENT LIGHT BULBS
PERSONNEL SHELTER HEAD FLUORESCENT LIGHT BULBS - TM-55-1945-205-24-4_347
TM-55-1945-205-24-4 Modular Causeway System (MCS) Floating Causeway FC-1 NSN 1945-01-473-2162 Manual
Page Navigation
263
264
265
266
267
268
269
270
271
272
273
TM 55-1945-205-24-4
0111 00 3/4 blank
0111 00
INSTALL PERSONNEL SHELTER FLUORESCENT LIGHT BULBS
1. Install middle light bulbs (4).
a.
Slide sleeve (9) onto light bulb (4).
b.
Position light bulb (4) near receptacle (8).
2.
Slide light bulb pins (12) into receptacle (5).
3.
Turn light bulb (4) 90° until bulb clicks into place.
4.
Install brackets (6) and screws (5) over middle light bulb (4).
5.
Install outer light bulbs (10) and (11).
a.
Position light bulb (4) near receptacle (8).
b.
Slide light bulb pins (12) into receptacle (8).
c.
Turn light bulb (4) 90° until bulb clicks into place.
6.
Position light cover (1) over light fixture (3).
7.
Tighten four captive screws (2) hand tight.
8.
Perform operational check
of personnel shelter fluorescent light bulb. (TM 55-1945-205-10-4)
END OF WORK PACKAGE
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business