TM 55-1945-205-24-4
0003 00 12
0003 00
LIFELINE AND LIFE RING SUBSYSTEM
Location
The lifeline subsystem is installed along the sides of the FC platform to protect personnel from falling overboard. The
stanchions for the lifelines are installed in the turn-tube fittings and ISO corner fittings of the modules. Chain is used
to span the gap between section openings. The lifeline arrangement will vary depending on FC configuration. The life
rings, nylon rope and strobe lights are attached to the life ring stanchions.
Description
The components of the lifeline subsystem consist of stanchions (two types), deck fittings (two types) and chain to
span the spaces between sections. The components of the life ring subsystem consist of a donut shaped flotation
device, nylon rope and strobe light.