• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL TOWING BRIDLE - TM-55-1945-205-10-2_132
INSTALLATION OF FENDERS - TM-55-1945-205-10-2_134

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  96    97    98    99    100  101  102    103    104    105    106  
TM 55-1945-205-10-2 0018 00 1 0018 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY FENDERS OPERATION UNDER USUAL CONDITIONS INITIAL SETUP: Tools Tool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0121 00) Life Preserver, Vest (Item 33, WP 0119 00) Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00) Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00) Helmet, Safety (Item 29, WP 0119 00) Personnel Required Seaman 88K PREPARATION FOR USE - INSTALLATION OF FENDERS :,1* All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death. 1. Install fenders. a. Attach tag lines to the ends of the securing lines.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.