• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL MOORING BITTS (cont) - TM-55-1945-205-10-2_126
TOWING BRIDLE, TOWING INTERFACE AND TOWING LIGHTS - TM-55-1945-205-10-2_129

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  91    92    93    94    95  96  97    98    99    100    101  
TM 55-1945-205-10-2 0016 00 5/6 blank 0016 00 c. Drive female guillotine bar (7) down using sledgehammer. INSTALL QUICK DISCONNECT ASSEMBLY 1. Using forklift and sling, position quick disconnect assembly (8) beside the mooring bitt (4). 2. Wrap the mounting chain (9) around the mooring bit (4) and secure the pelican hook (10) to the half link (11). END OF WORK PACKAGE 7 10 11 4 9 8







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.