• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GROUND PERSONNEL SHELTER - TM-55-1945-205-10-2_150
INSTALL PERSONNEL SHELTER POWER CABLE - TM-55-1945-205-10-2_152

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  113    114    115    116    117  118  119    120    121    122    123  
TM 55-1945-205-10-2 0021 00 3 0021 00 :,1* e. Apply a thin coating of antiseize compound to ground cable (1) terminal. f. Install flat washer (5), lock washer (4) and nut (3) on ground stud (2). g. Tighten ground stud nut (3). 3. Attach personnel shelter ground cable C-clamp (6) to module deck ISO fitting (7). :,1* a. Use wire brush to remove paint from ISO fitting (7) to ensure that ISO fitting grounding surface has a smooth, bright finish prior to grounding. :,1* b. Apply a thin coating of antiseize compound grounding surface. :,1* c. Using wire brush, clean C-clamp (6) grounding surface. d. Attach grounding clamp (6) to module ISO fitting (7).







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.