TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
SCOOP CONTROL CABLE MAINTENANCE
REMOVAL, INSTALLATION, AND ADJUSTMENT
INITIAL SETUP:
Equipment Condition
Tools and Special Tools
Hydrojet hatches opened and secured
Forward Repair System (FRS)
(TM 5-1940-322-10).
Battery hatch opened and secured
Materials/Parts
(TM 5-1940-322-10).
Scoop control head assembly removed
Engine hatches opened and secured
(TM 5-1940-322-10).
Personnel Required
Two
0034 00-1