• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ACCELERATOR LINKAGE ADJUSTMENT - Continued
ACCELERATOR LINKAGE ADJUSTMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  501    502    503    504    505  506  507    508    509    510    511  
img
.
TM
5-5420-202-20-2
ACCELERATOR LINKAGE ADJUSTMENT (Sheet 5 of 6)
Stop engine (TM 5-5420-202-10).
22.
23.
Insert either end of go/no-go gage .(S) between
stop pin (V) and bracket (W). Hold in this
position while technician in driver's station
presses pedal to full throttle position.
24.
With pedal in full throttle position, screw (X)
must contact floor and stop pin must contact
either end of go/no-go gage (S). If this require-
ment cannot be met, do steps 25 and 26.
If requirement is met, skip steps 25 and
26 and go to step 27.
25.
Using two 9/16 inch wrenches, loosen nut (Y)
and screw (X) on back side of accelerator
pedal (Z).
26.
Using two 9/16 inch wrenches, hold screw (X)
and tighten nut (Y).
27.
Holding pedal down (full throttle position), turn
screw out until it is against floor. It may be necessary
to press pedal down, raise and adjust, press it down
again, raise and adjust several times.
Go on to Sheet 6
7-304


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.