• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUEL SHUTOFF AND PERSONNEL HEATER CIRCUIT BREAKERS REPLACEMENT (Sheet 2 of 2)
RELAY AND CIRCUIT BREAKER MOUNTING PANEL REPLACEMENT (Sheet 1 of 2)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  166    167    168    169    170  171  172    173    174    175    176  
img
. . .
TM 5- 5420-202- 20 -3
HEU ENGINE ACCESSORY RELAY REPLACEMENT
1
TOOLS:
7/16 inch socket 1/2 inch drive
/2 inch drive ratchet
Spanner wrench
5 inch extension
PRELIMINARY PROCEDURES:
Remove access cover from floor in of commanders compartment (page17-9)
Disconnect three battery grounds (page 10-268)
REMOVAL:
1. Using spanner wrench disconnect wiring harness (A) from generator relay (B).
2. Using socket and ratchet remove two bolts (C) and washers (D) from generator relay (B) and plate (E).
3. Remove generator relay (B).
INSTALLATION:
1. Position generator relay (B) on plate (E).
2. Using socket and ratchet install two each screws (C) and washers (D).
3. Using spanner wrench install wiring harness (A) onto generator relay (B).
4. Connect battery grounds (page 10-268)
5. Install access cover in commander's compartment (page 17-9).
End of Task
Change 6
10-166.1/(10-166.2 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.