• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASKET/CONTROL PANEL POWER HARNESS REPLACEMENT (Sheet 3 of 4)
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT (Sheet 1 of 5)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  329    330    331    332    333  334  335    336    337    338    339  
img
. .
TM 5-5420-202-20-3
BASKET/CONTROL PANEL POWER HARNESS REPLACEMENT (Sheet 4 of 4)
4.
Install connector (K) of harness (A)
at basket disconnect (page 10-296.69).
5.
Connect connector (L) at master control
panel. Using spanner wrench, tighten
nut (M).
6.
Connect three ground straps at batteries
(page 10-268).
7.
Install right bulkhead access cover
page 17-3).
8.
Perform functional check (TM 5-5420-
202-10).
End of Task
5-30
10-296.28
Change 7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.