• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT (Sheet 3 of 5)
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT (Sheet 5 of 5)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  333    334    335    336    337  338  339    340    341    342    343  
img
.
TM 5-5420-202-20-3
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT (Sheet 4 of 5)
INSTALLATION:
Place harness assembly (A) in position
1.
behind straps (E) and through clamps
(H) as shown.
2.
Using 7/16 inch socket, install screws
(B), new lockwashers (C), and flat washers
(D) to secure straps (E) at three locations.
Using 7/16 inch socket, install screws (F)
3.
and flat washers (G) to secure clamps (H)
at six locations.
4.
Using 7/16 inch socket, install screws
(J) and new lockwashers (K) to secure
clamps (L) at vehicle floor and at purge
pump handle (M).
Go on to Sheet 5
5-34
10-296.32
Change 7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.