• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRACK LINK REPLACEMENT - Continued
SHOCK ABSORBER REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  842    843    844    845    846  847  848    849    850    851    852  
img
. .
TM 5-5420-202-20-3
SHOCK ABSORBER REPLACEMENT (Sheet 1 of 2)
TOOLS: Slip joint pliers
Pinch bar, 26 in. long
12 lb. hammer
Long round nose pliers
PERSONNEL: Two
TM 5-5420-202-10
REFERENCE:
PRELIMINARY PROCEDURE: Put transmission lever in park position (TM 5-5420-202-20-3)
REMOVAL:
1.
Using slip joint pliers, remove clip (A) from
lower grooved pin (B).
Using pinch bar, pry lower grooved pin (B) out
2.
of shock absorber yoke (C), while second person
holds shock absorber (D).
Using long round nose pliers, remove clip
3.
(E) from upper grooved pin (F).
TA249619
Go on to Sheet 2
14-93


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.