TM 5-5420-202-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 1 of 10)
Top Deck Replacement (Sheet 1 of 4)
SUBTASK INDEX
PROCEDURE
PAGE
Top Deck Replacement
Top Deck Door Panels Replacement
Top Deck Insulator Panel Replacement
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
TOOLS:
Socket handle (breaker bar)
1-1/2 in. socket with 3/4 in. drive
3/4 in. socket with 1/2 in. drive
1-1/8 in. socket with 3/4 in. drive
15/16 in. socket with 3/4 in. drive
1-1/8 in. open end wrench
Hoist (4,000 lb minimum capacity)
SUPPLIES:
SPECIAL TOOLS:
Sling (Item 32, Chapter 3, Section I)
PERSONNEL:
Three
REFERENCE:
TM 5-5420-2'Z-10
PRELIMINARY PROCEDURES:
If equipped, remove MICLIC support bracket
(TM 9-1375-215-14&P).
Disconnect holddown cylinder hose assemblies CV3 and CV4 at
REMOVAL:
1.
Using 15/16 inch socket with ratchet, loosen four locking screws (A) securing top grille doors.
Go on to Sheet 2