• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  937    938    939    940    941  942  943    944    945    946    947  
img
.
TM 5-5420-202-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 3 of 10)
Top Deck Replacement (Sheet 3 of 4)
Using two other technicians, get
8.
sling to lift top deck off
vehicle.
Place hoist hook through
9.
middle eye of sling. Use
hoist with at least 4,000 lb
capacity to lift top deck.
Using hoist, position sling with
10.
"T" toward front of vehicle.
Guide sling over top deck.
11.
12.
Connect four sling hooks to
four lifting handles of top deck.
WARNING
Be careful when lifting top deck. Serious
injury to personnel can result from care-
less handling.
13.
Lift top deck off vehicle. Put top
deck down in work area.
INSTALLATION:
1.
Using hoist with sling, lift top deck (A)
into position over powerplant. Sling
"T" should be toward front of vehicle.
2.
Lower top deck (A) into mounting position.
Go on to Sheet 4
16-23


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.