TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued
TOP DECK FRAME ASSEMBLY REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  941    942    943    944    945  946  947    948    949    950    951  
img
. . . . .
TM 5-5420-202-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 7 of 10)
Top Deck Insulator Panel Replacement (Sheet 1 of 4)
PROCEDURE INDEX
PAGE
PROCEDURE
Removal
16-27
16-29
Installation
T O O L S : Ratchet with 1/2in. drive
7/16 in. socket with 1/2 in. drive
9/16 in. socket with 1/2 in. drive
Drift pin
Hoist (capable of lifting 4,000 pounds)
SUPPLIES:
Lockwashers (51 required)
SPECIAL TOOLS Sling (Item 32, Chapter 3, Section I)
Two
PERSONNEL:
Remove top deck (page 16-21)
PRELIMINARY
PROCEDURES:
3. Using hoist, raise end (D) of top deck
(E) until top deck is standing on end
(F).
Go on to sheet 2
TA249700
16-27