• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PERSONNEL HEATER REPAIR - Continued
PERSONNEL HEATER MOUNTING CLAMP REPLACEMENT

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -4 Page Navigation
  78    79    80    81    82  83  84    85    86    87    88  
img
. . .
TM 5-5420-202-20-4
PERSONNEL HEATER REPAIR (Sheet 8 of 8)
Personnel Ignition Control Replacement (Sheet 2 of 2)
INSTALLATION:
1. Mount ignition control assembly (A) to heater,
and install two screws and lockwashers (B).
2. Using screwdriver tighten four screws (B) to
secure ignition control (A) to heater.
3. Route lead (C) under heater solenoid
to terminal (N.O.) (D) on flame detector
switch (E).
4. Install screw and lockwasher (F) securing
lead (C) to flame detector switch.(E).
5. Using screwdriver, tighten screw (F).
6. Connect two leads (G) and (H) to ignition
control (A).
7. Install plastic band (J).
8. Install heater cover (page 18-9, steps 7
and 8).
9. Connect electrical connector (page 18-9,
steps 9 and 10).
10. Check heater operation (TM 5-5420-202-10)
End of Task
TA248613
18-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.