TM 5-5420-202-20-4
SMOKE GENERATOR TEE-TO-TURBOSUPERCHARGER TUBE ASSEMBLY REPLACEMENT
(Sheet 5 of 5)
10.
Position two cushions (J) and two retaining straps (K) over tubes (L) (two places).
11.
Install screw (M) through clamps (N and P), cushions (J), retaining straps (K), lockwasher
and nut (R).
12.
Using 7/16 inch wrench to hold nut (R), use 7/16 inch wrench to tighten screw (M) to
secure clamps, cushions, and retaining straps.
WARNING
Do not activate smoke generator in a building or closed area or with personnel near.
CAUTION
Always be aware of wind direction and speed when using smoke generator.
13.
attained.
Run engine at 1600 rpm and activate smoke generator. Observe operation. Shut
smoke generator. Shut down engine.
14.
Check smoke generator lines for leaks. Correct as necessary.
15.
Install engine shroud (page 9-31).
End of Task
TA248779
21-38