• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 22. SMOKE GRENADE LAUNCHER MAINTENANCE
SMOKE GRENADE POWER BOX REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -4 Page Navigation
  253    254    255    256    257  258  259    260    261    262    263  
img
.
TM 5-5420-202-20-4
SMOKE GRENADE POWER BOX REPLACEMENT (Sheet 1 of 2)
TOOLS: 7/16 in. combination box and open end wrench (2 required)
Slip joint pliers, conduit style, with plastic jaw inserts
SUPPLIES:
Lockwashers (2 required)
REMOVAL:
Make sure there are no smoke
grenades in dischargers. Acciden-
tal firing of grenade c o u l d
hurt or kill you.
Set MASTER BATTERY switch (A)
1.
to OFF.
2.
Using pliers, disconnect electrical
connector (B) from power box (C).
Using one wrench to hold screw (D)
3.
and other wrench to turn nut (E),
remove two screws (D), Iockwashers (F),
and nuts (E) securing box (C) to bracket (G).
Remove box (C) from bracket (G).
4.
Go on to Sheet 2
TA248784
22-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.