TM 5-5420-202-34
ENGINE REPLACEMENT
Engine replacement requires the transfer of components between the unserviceable engine
and the replacement engine. The following must be performed to replace the engine.
PRELIMINARY
PROCEDURES:
WARNING
will not move.
Using powerplant sling (Item 1, Chapter 2, Section I) and suitable hoist (engine weighs
approximately 5,000 pounds), remove replacement engine from container and place on two
10 x 10 x 12 inch wooden blocks. Position blocks under each end of engine oil pan. Remove
Remove
powerplant (TM 5-5420-202-20).
steering linkage and brackets (TM 5-5420-202-20).
Remove
shifting linkage and brackets (TM 5-5420-202-20).
Remove
engine shroud and supports (TM 5-5420-202-20).
Remove
Remove
engine mounts (TM 5-5420-202-20).
PROCEDURE INDEX
PAGE
PROCEDURE
3-23
Accessory Drive Removal from Replacement Engine
3-29
Power Takeoff Removal from Unserviceable Engine
3-39
Power Takeoff Installation on Replacement Engine
3-50
Accessory Drive Installation on Unserviceable Engine
3-57
Replacement Engine Installation
3-22