TM 5-5420-202-34
FUEL PRIMER PUMP REPAIR (Sheet 6 of 6)
11.
Place lever (R) in vise.
12.
Place operating handle (S) in position
on lever (R).
13.
Using 1-1/8 inch wrench, install nut (T)
and lockwasher (U).
14.
Slide two connector shells (V) on two
leads of switch assembly (K).
15.
Install two slotted washers (W) and slide
connector shells (V) down until seated.
16.
Remove handle assembly from vise.
17.
Place link (X) in position on primer pump
(C).
18.
Install pin (Y) through link (X) and primer
pump (C).
19.
Using pliers, install cotter pin (Z).
Place handle assembly (AA) in position
20.
on primer pump (C).
21.
Install two pins (AB).
Using pliers, install two cotter pins (AC).
22.
Place clamp (AD) in position.
23.
24.
Using 7/16 inch wrench, install screw
(AE).
25.
End of Task