TM 5-5420-203-14
FAR-SHORE CENTER SECTION REPLACEMENT (Sheet 3 of 4)
m. Using a lifting device and sling, position
damaged center section (4) aside.
INSTALLATION
INSTALL FAR-SHORE CENTER SECTION (4 AND 7).
a. Using a lifting device and sling, place the
replacement center section about 1 ft from (and
in line with) center sections (4 and 7) to be
joined. Leave lifting device and sling attached.
b. Route flexible hydraulic line (16) located on
center section (7) through hose guide (17)
located on replacement section (4).
c. Connect end of flexible hydraulic line (16) to
center section (4). Be sure connection is secure.
d. Using a lifting device, position replacement
section (4) so connecting points ( 15 and 18)
mate with other center section (7). Be sure
flexible hydraulic line connected is not pinched.
NOTE
Some side to side and up and down
adjustment may be required to install
connecting pins.
e. Install quadrant hinge pin (6) through
lower center hinge point (19) of center
sections (4 and 7).
f. Install center section pin (12) though lower
center section hinge point (18). Install pin
retainer (11) through pin (12).
g. Install connecting pin (14) through upper
center section hinge connecting point (15) of
center sections (4 and 7). Install pin retainer
(13) in pin (14).
h. Install connecting pin (9) through center
section connecting point (10). Install pin
retainer (8) in pin (9).
3-66