Table 4-1. Unit Preventive Maintenance Checks and Services (PMCS) for the Transporter cont.LocationItemIntervalItem To Be InspectedEquipment Is NotNo.Item toService/CheckProcedureReady/Available If20Monthly Light, MarkerEnsure both red clearance light and blackoutand Reflectormarker are functional.Ensure red reflector is serviceable.Check lenses and housings for cracks.Check wire harness for loose/bare wiring andconnector integrity.21Monthly WalkwayEnsure clamp is secured property to walkway.Clamp not securedClampproperty.Check for deformation.22Monthly Cradle ClampEnsure clamp position is in proper position forintended operation.Check for deformation of cradle retaining hook.Ensure clamp alignment hole alines withsupport tube.23Monthly Pivot clampEnsure clamp is properly seated againstClamp not tightly seatedsaddle.against saddle.Check grease fitting for serviceability.Inspect for cracks.Cracks noted.24MonthlyPivot clampEnsure clamp is properly seated againstClamp not tightly seatedsaddle.against saddle.Check grease fitting for serviceability.Inspect for cracks.Cracks noted.25Monthly Cradle ClampEnsure clamp position is in proper position forintended operation.Check for deformation of cradle retaining hook.Ensure clamp alignment hole alines withsupport tube.26Monthly WalkwayCheck clamp position. (Should be snugClampagainst walkway).Inspect for deformation and loose, broken ormissing hardware.27Monthly Bay RollerEnsure roller rotates freely.AssemblyCheck roller for gouges, nicks, and cuts toRoller damages bay.surface area.Ensure grease fitting is serviceable.Check axle, bearing and thrust washerserviceability.4-8TM 5-5420-209-12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business