TM 5-5420-209-12
Table 4-1. Unit Preventive Maintenanee Checks and Services (PMCS) for the Transporter cont.
Location
Item
Interval
Item to
Item To Be Inspected
Equipment Is Not
Service/Check
Procedure
Ready/Available If
34
Monthly Cab Protector
Inspect for cracks and holes.
Either rib eroded more
Bracket
than 50%.
35
Monthly
Locking
Ensure cylinder engages front support bracket
Cylinder does not
Cylinder
eye hole without binding or twisting bracket.
extend or retract or
Assembly
Check cylinder shaft, lines and connectors for
twists bracket.
leakage, burrs, nicks compression and
Class II or III leak noted.
scratches.
Inspect hoses for compression and leakage.
Inspect cylinder bracket for cracks, broken
welds and deformation.
36
Monthly
Front Support
Ensure front support is properly secured to
Support is incorrectly
transporter.
secured.
Check seams and adjoining plates for cracks,
Cracks or broken welds,
broken welds and deformation.
or deformation noted.
37
Monthly
Boom Sheave
Ensure sheave rotates with cables.
Inspect for cracks, gouges, erosion and
deformation.
38
Monthly
Boom
Ensure boom can be fully raised and lowered.
Boom does not function
properly.
Check for cracks, broken welds, warping and
Cracks or broken welds
deformation.
noted.
39
Monthly Cable Channel
Inspect for warping or deformation.
40
Monthly Cable Rollers
Ensure roller rotates with cable.
Inspect for burrs, nicks and gouges.
41
Monthly Center Support
Ensure center support is properly secured to
Support is incorrectly
transporter.
secured.
Check seams and adjoining plates for cracks,
Cracks or broken welds,
broken welds and deformation.
or deformation noted.
42
Monthly Bay Guide
Check plate for broken welds and deformation.
Broken welds noted or
Plate
deformation damages
bays.
NOTE
Use of U clamps to secure
cable is authorized only in
emergency situation
4-10
No.