ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1CHAPTER 2OPERATING INSTRUCTIONSPageSection I. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) ............................ 2-12-1 INTRODUCTION ............................................................................................................ 2-12-2 PREVENTIVE MAINTENANCE CHECKS AND SERVICES .......................................... 2-1Section II. OPERATION UNDER USUAL CONDITIONS ................................................................ 2-3Section III. OPERATION UNDER UNUSUAL CONDITIONS ........................................................... 2-42-3 LAUNCHING IN HIGH WINDS ....................................................................................... 2-42-4 LAUNCHING UP STEEP SLOPES ................................................................................2-6Section I. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)2-1. INTRODUCTIONTo ensure that the Medium Girder Bridge (MGB) set, the erection set and the link reinforcement set (LRS) areready for operation at all times, they must be inspected systematically so that the defects may be discovered and correctedbefore they result in serious damage or failure.a. Defects discovered during operation of the unit shall be noted and rectified, as soon as an operation hasceased. Sop operation that would damage equipment operation were to continue.b. All deficiencies and shortcomings shall be reported together with corrective action taken on DA Form 2404,Equipment Inspection and Maintenance Worksheet, at the earliest opportunity.c. If equipment fails to operate, trouble shoot with proper equipment (see Chapter 8f this manual. Reportdeficiencies using the proper forms; see DA Pamphlet 738750.2-2. PREVENTIVE MAINTENANCE CHECKS AND SERVICESa. The preventive maintenance checks and services for MGB erected, in position and in combat use, are shownin Table 2-1.NOTEIf equipment must be kept In continuous operation, check and service only those items hat can bechecked and serviced without disturbing operation. Make complete checks and serves whenequipment can be closed to traffic.If any component shows obvious signs of damage, refer to Unit PMCS In TM 5-5420-212-23. In thetable below items 2 through 9 "Equipment not ready/available" refers to the component, not thebridge.2-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business