ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1This length includes the R distance (maximum distance to the rear of the front or capsill roller beam, required forconstruction) and truck with push bar attached. The width allows for ample construction space and good spacing of palletsfrom centerline. If needed, this area can be reduced considerably by bringing in pallet loads one at a time or as needed.The desired size of a site is shown on Figure 3-3.FIGURE 3-3. Assembly sitee.Height of banks above flowing water(1)Single story bridges. The bank heights above flowing water or obstructions in the gap should be aminimum of 2 ft (0.6 m).3-12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business