ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 3-6 Bridge Selection TablesSS 4 - 12 BaysDS 1 - 12 BaysDS 13 - 22 Bays w/o LRSDS 13 - 22 Bays w/LRSAR GapNo.AR GapNo.AR GapNo.AR GapNo.ofMLCof*ofMLCofmMLC*Baysm(T)*BaysmMLCBaysm(T)*Bays3.7 - 7.170(T)46.4 - 9.070128.3 - 30.9501328.3 - 30.970135.6 - 9.070(T)58.2 - 10.870230.2 - 32.8501430.2 - 32.870147.4 - 10.840610.0 - 12.670332.0 - 34.6401532.0 - 34.170159.2 - 12.630711.9 - 14.570433.8 - 36.4401633.8 - 36.4701611.0 - 14.430813.7 - 16.370535.6 - 38.2301735.6 - 38.2701712.9 - 16.324915.5 - 18.170637.5 - 40.1301837.5 - 40.1701814.7 - 18.1201017.3 - 19.970739.3 - 41.9241939.3 - 41.9701916.5 - 19.9161119.2 - 21.870841.1 - 43.7242041.1 - 43.7702018.4 - 21.8161221.0 - 23.670943.0 - 45.6202143.0 - 45.1702122.8 - 25.4701044.8 - 47.4162244.8 - 46.2702224.7 - 27.3701126.5 - 29.17012* See Table 1-1 for transverse slope and crossing restrictions, and MLC 100(W) capability. (T) = TrackedEXAMPLE: Given a mission to provide an MGB with an MLC and the reconnaissance report gives an AR Gap of 23.8m.Read down the AR Gap range columns under the different sections (A through D) until a range of gaps is found that willbracket the AR Gap given. The first range found is 21.Om -23.6m, followed by a second range, 22.8m - 25.4m, which alsobrackets the AR Gap. The procedure for determining which range to use will be discussed later. What can be determinedat this point is that a DS 2E+9 or a 2E+ 10 bay bridge will span the AR Gap given, provide a MLC 70 capability, and thatyou must go to paragraph 3-14 for further design procedures.c.Bridge Selected. Using the bridge selected, go to the appropriate paragraph:* paragraph 3-12.4 - 12 Bay SS Design.* paragraph 3-13, 9-12 Bay SS Design on restricted sites.* paragraph 3-14, 2E+1 - 2E+12 Bay DS Design.* paragraph 3-15, 2E+1 - 2E+12 Bay Design on restricted sites.* paragraph 3-16, 2E+13 - 2E+22 Bay DS (w/oLRS) Design.* paragraph 3-17, 2E+13 - 2E+22 Bay DS (w/LRS) Design.3-8RIDGE CONSTRUCTION TIMESa.Building times for various bridge lengths are given in Table 1-6. These times are figured from thedownloading of the first pallet load on site to the opening of the bridge for traffic.3-15
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business