ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(2)Double story bridges (2E + 1 thru 2E + 12 bay ). The bank height above flowing water or obstructions inthe gap should be a minimum of 2 ft (0.6 m).(3)Link reinforced bridges. The bank heights above flowing water or obstructions in the gap should be aminimum of 12.0 ft (3.7 m). In addition, there must be no obstacle intruding above a plane inclined 20 degrees downwardin the gap for a distance of 15 ft (4.6 m) from each AR Peg as shown below (fig. 3-4).FIGURE 3-4. Bank clearance-link reinforced bridgesIf the bank height is less than 12.0 ft (3.7 m) the rules in (a) and (b) below apply.(a)For bridges 2E + 14 bays and below there is no limit on bank height as long as the current does notexceed 5 fps (1.5 m/s) in which the reinforcing links can be immersed during launching and before tensioning.(b)For bridges 2E + 15 bays and above there is no limit on bank height as long as the current does notexceed either:13.5 fps (1.0 m/s) in which case the reinforcement can be immersed only during launching andbefore tensioning.2The current speed is shown in Table 3-4.TABLE 3-4 Maximum current velocity v bridge length2E + No.22212019181716151413of BaysBridgeft162156150144138132126120114108Lengthm49.447.645.743.942.140.238.436.634.832.9Current onfps1.641.643.083.673.934.296.957.678.438.43immersed linksm/s0.50.50.941.121.21.312.122.342.572.573-13
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business