ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1FIGURE 3-16 DS 22 Bay with LRS-Distance R,T,G,H &Nm.Rule 1Use a LNCG setting to give adequate nose clearance (N) and tai clearance ). See Table 3-33, column g), (h) or(i). Both roller beams are in the low position.(1)Choose a NCG setting from Table 3-33, columns (g) (h) or ( which give an N greater than H If none ofthese three choices meet the criteria. choose the highest value available.(2)Check to see if the T value from Table 333, column (j) is greater than G.(3)If N is greater than H or if T is not greater than G, proceed to Rule 2. If N is greater than H and T isgreater than G the LNCG setting chosen has adequate nose lift and the bridge selected has adequate tail clearanceproceed to loads requiredTable 3-33. Rule 1 - DS 13-22 Bay with LRSNose Lift N with Nose Cross Girder at: (both CRB and RRB in high position)2E + No. of BaysSetting No. 6Yellow(g)Setting No. 4Yellow(h)Setting No. 2Yellow(i)Tail LiftT(j)130.481.873.520.40140.311.723.350.37150.251.643.290.3416-0.621.273.250.3017-0.771.123.100.2718-1.060.802.7119-1.460.402.320.2120-1.750.112.0321-2.080.05.1.750.1822-2.44-0.311.400.153-46
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business