ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
n.
Rule 2.
Lower the RRB to increase N. If there is ample tail clearance, some increase in N can be obtained by keeping the
CRB in its highest position and lowering the RRB to its lowest position. The mathematical equation for this process is
shown under Table 3-34, column (k).
N Rule 2a. = N Rule 1 + Value N calculated from the equation shown under Table 3-34, column (k)
Table 3-34. Rule 2 - DS 13-22 Bay with LRS
2E + No. of
Bays
Lowering RRB to increase N
(k)
13
1.9 (0.82 - G)
14
1.9 (0.79 - G)
15
1.9 (0.76 - G)
16
1.9 (0.72 - G)
17
1.9 (0.69 - G)
18
1.9 (0.66 - G)
19 - 20
1.9 (0.63 - G)
21
1.9 (0.60 - G)
22
1.9 (0.57 - G)
o.
Loads required
From Table 3-35, determine the truck and trailer loads required for the bridge.
NOTE
Additional vehicles are required to transport personnel.
Table 3-35. MGB Pallets DS 13-22 Bay with LRS
No. of Bays
Pallet Type
13 - 15
16 - 18
19 - 21
22
Erection
1
1
1
1
Bridge
8
9
10
11
Link
2
2
2
2
Total
11
12
13
14
3-47