ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1n.Rule 2.Lower the RRB to increase N. If there is ample tail clearance, some increase in N can be obtained by keeping theCRB in its highest position and lowering the RRB to its lowest position. The mathematical equation for this process isshown under Table 3-34, column (k).N Rule 2a. = N Rule 1 + Value N calculated from the equation shown under Table 3-34, column (k)Table 3-34. Rule 2 - DS 13-22 Bay with LRS2E + No. ofBaysLowering RRB to increase N(k)131.9 (0.82 - G)141.9 (0.79 - G)151.9 (0.76 - G)161.9 (0.72 - G)171.9 (0.69 - G)181.9 (0.66 - G)19 - 201.9 (0.63 - G)211.9 (0.60 - G)221.9 (0.57 - G)o.Loads requiredFrom Table 3-35, determine the truck and trailer loads required for the bridge.NOTEAdditional vehicles are required to transport personnel.Table 3-35. MGB Pallets DS 13-22 Bay with LRSNo. of BaysPallet Type13 - 1516 - 1819 - 2122Erection1111Bridge891011Link2222Total111213143-47
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business