ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(g)Unload pallets on ground and use components to construct 6 bays of bridge. Place all components notrequired at this time to sides of site as shown, and carry all empty pallets off site.(f)Move Trucks 2 and 4 toward uncompleted end of bridge and stop when in line with bridge. Then driveTrucks 1 and 3 with DSC Trailers onto site and reverse up to trucks 2 and 4. Off-load the pallets, thendrive off site.3-140
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business