ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(9)
Unlock roller beam rollers, lift girders and boom bridge forward until panel point lp2 is over roller beam
rollers; lock rollers. Building pedestals are now under 2p7.
(10) Add bay 3.
(11) Unlock rollers and boom bridge forward until panel point 1p7 is over rollers; lock rollers.
(12) Add bay 4.
(13) Unlock rollers and boom bridge forward until panel point 2p3 is over rollers; lock rollers.
(14) Add bay 5.
(15) Unlock rollers and boom bridge forward until panel point 2p7 is over rollers; lock rollers.
(16) Fit rear bankseat beam to top panels (para. 4-9a).
(17) Unlock rollers and boom bridge four panel points to 3p3; lock rollers.
NOTE
At panel point 3p3, the bridge Is positioned with its center of gravity (CG) over the roller beam.
(18) To set up landing roller under launching nose.
(a)
Lift rear of bridge until launching nose rests on far bank, and hold in this position.
(b)
Two personnel shall carry landing roller, jack, jack handle and one piece of packing (3 in x 8 in x 36
in) across bridge to far bank.
5-11