ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1NOTEThe center of gravity (CG) of the bridge is now at the panel pin connection the top panel andbankseat beam. Keep the CG 6 in (15cm) from the center of the roller beam.(6)NCOIC places building pedestals under rear of bay 1 at panel point 1p7.(7)Add bay 2.(8)Lift girders and move building pedestals under middle of bay 2 to panel point 2p4.NOTEThe building pedestals are now in their final position therefore no further movement of pedestalsis required.5-10
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business