ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
NOTE
The center of gravity (CG) of the bridge is now at the panel pin connection the top panel and
bankseat beam. Keep the CG 6 in (15cm) from the center of the roller beam.
(6)
NCOIC places building pedestals under rear of bay 1 at panel point 1p7.
(7)
Add bay 2.
(8)
Lift girders and move building pedestals under middle of bay 2 to panel point 2p4.
NOTE
The building pedestals are now in their final position therefore no further movement of pedestals
is required.
5-10