ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(23) Unlock rollers and boom bridge to panel point lp7; lock rollers.(24) Remove bay 4.(25) Unlock rollers, boom bridge to panel point 1p2, then lock rollers. Position building pedestals under panelpoint 2p7.(26) Remove bay 3.(27) Unlock rollers, boom bridge until bankseat beam is over roller beam, then lock rollers. Ensure that panelpin connecting bankseat beam and top panel is 6 in (15 cm) from center of roller beam. Positionbuilding pedestals under panel point 1p7.5-17
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business