ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(28) Remove bay 2.
(29) To disassemble end of bridge.
(a)
Unlock rollers, lift bay 1 clear of building pedestals and position building pedestals with their tops
about 5 ft (1.5 m) apart, at a point 9 ft (2.7 m) from center of roller beam.
(b)
Carry entire end of bridge away from gap with launching nose sections riding on center rollers of
roller beam.
(c)
Stop movement of bridge when bankseat beam is over building pedestals, then lower bankseat
beam onto pedestals. DO NOT let top panels down.
(d)
The NCOIC of work party shall hold launching nose down on center rollers of roller beam while bay
1 top panels are removed.
5-18