ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
5-3.
ASSEMBLY - SINGLE STORY - 12 BAY
a.
Set Up and Align Roller Beam
(1) Place roller beam assembly on RB peg, centered over the peg and at 90° to bridge centerline (para.4-
5a.).
(2)
Place building pedestals in position 5 ft (1.5 m) behind roller beam, ready for step b.(3). Place building
pedestals with their long side parallel to roller beam, in line with the roller beam outer rollers.
b
Assembly
(1)
Place bankseat beam on roller beam.
(a)
Ensure rollers are locked.
(b)
Bankseat beam must be steadied and held on top of roller beam by at least two men.
(c)
Ensure that bankseat beam is centered over roller beam.
NOTE
For ease of construction, the next step must be performed simultaneously by both panel crews.
(2)
Connect first top panels to bankseat beam (bay 1).
(3)
Position building pedestals under rear of bay 1 at 1p7.
5-20