ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(41) Remove bay 3.(42) Unlock rollers and boom bridge until bankseat beam is centered over roller beam; lock rollers.(43) Lift rear of girders at bay 2, and reposition the building pedestals under bay 1 at panel point 1 p7.(44) Remove bay 2.(45) Remove bay 1 top panels using at least two personnel to steady bankseat beam on top of roller beam.(46) Remove bankseat beam from roller beam.(47) Disassemble roller beam.(48) Remove all components from site.5-31
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business