ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(41) Remove bay 3.
(42) Unlock rollers and boom bridge until bankseat beam is centered over roller beam; lock rollers.
(43) Lift rear of girders at bay 2, and reposition the building pedestals under bay 1 at panel point 1 p7.
(44) Remove bay 2.
(45) Remove bay 1 top panels using at least two personnel to steady bankseat beam on top of roller beam.
(46) Remove bankseat beam from roller beam.
(47) Disassemble roller beam.
(48) Remove all components from site.
5-31