ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(26) Remove deck unit from bay 7 and 3, then remove bay 8.
(27) Unlock rollers and boom bridge to panel point 1p4. Lock rollers.
(28) To remove sixth nose section (6N1).
(a)
Remove retainer clip from panel pin in nose roller and anchorage tube.
(b)
With center crew prepared to move launching nose to rear of site, remove panel pin from nose
roller.
(c)
Lift gravity catch and move launching nose to rear until next anchorage tube is next to nose roller.
1
If nose is uphill, move nose forward until center vertical is in front of nose roller. Put panel pin
through nose roller and behind center vertical.
2
If nose is downhill, move nose to rear until center vertical is behind nose roller. Put panel pin
through nose roller and in front of center vertical.
(d)
Remove nose section (6N1).
(29) Remove bay 7.
(30) Unlock rollers and boom bridge to panel point 1p2. Lock rollers.
(31) Remove three heavy nose sections (5N1, 4N1, 3N1) as described in step (28).
(32) Remove bay 6.
(33) To remove second nose section (2N1).
(a)
With center crew prepared to move launching nose to the rear of site, remove panel pin from nose
roller.
(b)
Lift gravity catch and move launching nose to rear until junction of LLN front and LLN rear is just
gap side of nose roller.
(c)
Put a panel pin through the nose section against launching nose cross girder rollers. If tip of nose
is uphill place pin in front of rollers, if tip is downhill, place pin behind rollers.
(d)
Remove 2N1.
(34)
Remove bay 5.
(35)
Remove landing roller pedestal from launching nose.
5-29