ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(7)Position chain holdfasts on site as shown. Drive nine pickets through links of each holdfast.(8)After bridge is lowered to ground, remove and unroll coil(S) of cable from top panels, and stretch outtoward holdfasts(9)Feed running end of cable through link of chain holdfasts, and take up slack by hand and attach cablerips to cable5-49
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business