ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-2. Building and Boom Table - 2E + 7 through 2E + 12 Bay Double Story (Normal Site)Bridge ft7278849096102Length m21.923.825.627.429.331.12E + No. of Bays789101112L/Nose4N15N15N15N16N16N1Build E + 1with RRB at:1p21p21p21p21p21p2AddNote aNote aNote aNote aNote aNote a2,32,32,32,32,32,34N1*5N1*5N1*5N1*6N1*6N1*44,54,54,54,54,5(CG)(Ap2)(1p0)(1p0)(1p0)(Ap2)(Ap2)Boom3p03p23p23p23p03p0Add5,6,76,7,86,7,86,7,86,7,86,7,8(CG)(2p2)(2p5)(2p5)(2p5)(2p3)(2p3)Boom4p44p64p64p64p44p4AddEE9,E9,109,10,119,10,11(CG)(3p6)(3p7)(4p3)(3p5)(3p7)(3p7)Boom5p76p16p1AddEE12, E(CG)(5p0)(5p2)(5p6)Launch(3p6)(3p7)(4p3)(5p0)(5p2)(5p6)Position LRPLZ 4LZ 8LZ 5LZ 3LZ 8LZNote bNote bNote bNote bNote b5 Note bLaunchDp2Dp2Dp2Dp2Dp2Dp2RemoveRRBRRBRRBRRBRRBRRBComplete byNote c,dNote c,dNote c,dNote c,dNote c,dNote c,dNOTES:a.Add LNCG posts, LNCG and nose roller.b.Check the LR is under LZ given or higher. Remove nose sections as they pass LRP, observing minimum 5 ft(1.5 m) overhang. Leave last three nose sections in place until far bank end of bridge has been lowered toground.c.Launch until far bank end of bridge is 9 in (23 cm) from LRP, or end of ETP overhangs FRB by 1.5 ft (0.5 m).d.Put bridge on ground.*Add entire launching nose with LRP secured with tie down strap.( )Center of gravity.6-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business