ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-1. Building and Boom Table - 2E + 1 through 2E + 6 Bay Double Story (Normal Site)Bridge ft364248546066Length m11.012.814.616.518.320.12E + No. of Bays123456L/Nose2N13N13N13N14N14N1Build E + 1with RRB at:1p21p21p21p21p21p2AddNote aNote aNote aNote aNote aNote a2N1*22,32,32,32,3E3N1*3N1*3N1*4N1*4N1*444(CG)(1p0)(Bp5)(Bp0)(Ap2)(Ap2)(Ap2)Boom1p62p43p03p03p0AddEEE5, E5, 6(CG)(1p2)(1p6)(2p3)(2p5)(1p6)Boom4p0AddE(CG)(3p1)Launch(1pO)(1p2)(1p6)(2p3)(2p5)(3pl)Position LRPLZ 3LZ 8LZ 5LZ 4LZ 8LZ 5Note bNote bNote bNote bNote bNote bLaunchDp2Dp2Dp2Dp2Dp2Dp2RemoveRRBRRBRRBRRBRRBRRBComplete byNote c,dNote c,dNote c,dNote c,dNote c,dNote c,dNOTES:a.Add LNCG posts, LNCG and nose roller.b.Check the LR is under LZ given or higher. Remove nose sections as they pass LRP, observing minimum 5 ft(1.5 m) overhang. Leave last three nose sections in place until far bank end of bridge has been lowered toground.c.Launch until far bank end of bridge is 9 in (23 cm) from LRP, or end of ETP overhangs FRB by 1.5 ft (0.5 m).d.Put bridge on ground.*Add entire launching nose with LRP secured with tie down strap.( )Center of gravity.6-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business