TABLE 6-6. Building and Boom Table - 2E + 7 through 2E + 9 Bay Double Story (Restricted Site)
Bridge ft
72
78
84
Length m
21.9
23.8
25.6
2E + No. of Bays
7
8
9
L/Nose
5N1
6N1
6N1
7N1
6N1
7N1
Build E+1 with RRB at
1p2
1p2
1p2
1p2
1p2
1p2
Add
Note a
Note a
Note a
Note a
Note a
Note a
2,3,5N1*
2,3, 6N1*,
2,3, 6N1*
2,3, 7N1*,4
2,3,6N1*
2,3,7N1*,4
(CG)
(Bp4)
(Bp7)
(Bp7)
(Bp5)
(Bp7)
(BP5)
Boom
2p2
1p7
1p7
1p7
2p1
Add
4 and 5
4
4
4 and 5
(CG)
(1p0)
(Bp2)
(Bp2)
(Ap2)
(Bp0)
Boom
3p2
2p4
3p0
Add
6
5
6
(CG)
(1p4)
(Ap2)
(1p2)
Boom
3p7
3p0
3p4
Add
7
6
7
(CG)
(2p0)
(1p2)
(1p6)
Boom
4p0
Add
8
(CG)
(2p3)
Launch
(2p0)
(Bp2)
(1p2)
(Bp5)
(2p3)
(Bp0)
Position LRP
LZ 2
LZ 2
LZ 2
LZ 4
LZ 3
LZ 1
Note b
Note b
Note b
Note b
Note b
Note b
Launch
5p4
2p4
4p4
2p4
6p4
3p4
Remove
RRB
RRB
RRB
RRB
RRB
RRB
Launch
7p4
4p4
6p4
4p4
8p4
5p4
Add
E
5
7
5
9
6
Launch
5p4
7p4
5p4
9p4
6P4
Add
6
8
6
E
7
Launch
6p4
8p4
6p4
7p4
Add
7
E
7
8
Launch
7p4
7p4
8p4
Add
E
8
9
Launch
8p4
9p4
Add
E
E
Complete By:
Note c,d
Note c,d
Note c,d
Note c,d
Note c,d
Note c,d
NOTES:
a.
Add LNCG posts, LNCG and nose roller.
b.
Check LR is under LZ given or higher. Remove nose sections as they pass LRP, observing minimum 5 ft
(1.5 m) overhang. Leave last three nose sections in place until far bank end of bridge has been lowered to
ground.
c.
Launch until far bank end of bridge is 9 in (23 cm) from LRP, or end of ETP overhangs CRB by 1.5 ft (0.5 m).
d.
Put bridge on ground.
*
Add entire launching nose with LRP secured with tie down strap.
( )
Center of gravity.
6-8