ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-6. Building and Boom Table - 2E + 7 through 2E + 9 Bay Double Story (Restricted Site)Bridge ft 72 78 84Length m 21.9 23.8 25.62E + No. of Bays 7 8 9L/Nose 5N1 6N1 6N1 7N1 6N1 7N1Build E+1 with RRB at 1p2 1p2 1p2 1p2 1p2 1p2Add Note a Note a Note a Note a Note a Note a2,3,5N1* 2,3, 6N1*, 2,3, 6N1* 2,3, 7N1*,4 2,3,6N1* 2,3,7N1*,4(CG) (Bp4) (Bp7) (Bp7) (Bp5) (Bp7) (BP5)Boom 2p2 1p7 1p7 1p7 2p1Add 4 and 5 4 4 4 and 5(CG) (1p0) (Bp2) (Bp2) (Ap2) (Bp0)Boom 3p2 2p4 3p0Add 6 5 6(CG) (1p4) (Ap2) (1p2)Boom 3p7 3p0 3p4Add 7 6 7(CG) (2p0) (1p2) (1p6)Boom 4p0Add 8(CG) (2p3)Launch (2p0) (Bp2) (1p2) (Bp5) (2p3) (Bp0)Position LRP LZ 2 LZ 2 LZ 2 LZ 4 LZ 3 LZ 1Note b Note b Note b Note b Note b Note bLaunch 5p4 2p4 4p4 2p4 6p4 3p4Remove RRB RRB RRB RRB RRB RRBLaunch 7p4 4p4 6p4 4p4 8p4 5p4Add E 5 7 5 9 6Launch 5p4 7p4 5p4 9p4 6P4Add 6 8 6 E 7Launch 6p4 8p4 6p4 7p4Add 7 E 7 8Launch 7p4 7p4 8p4Add E 8 9Launch 8p4 9p4Add EEComplete By: Note c,d Note c,d Note c,d Note c,d Note c,d Note c,dNOTES:a. Add LNCG posts, LNCG and nose roller.b. Check LR is under LZ given or higher. Remove nose sections as they pass LRP, observing minimum 5 ft(1.5 m) overhang. Leave last three nose sections in place until far bank end of bridge has been lowered toground.c. Launch until far bank end of bridge is 9 in (23 cm) from LRP, or end of ETP overhangs CRB by 1.5 ft (0.5 m).d. Put bridge on ground.* Add entire launching nose with LRP secured with tie down strap.( ) Center of gravity.6-8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business