ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-4. Building and Boom Table - 2E + 18 through 2E + 22 bay Double Story (w/o LRS)(Normal Site)Bridge ft138144150156162Length m42.143.945.747.649.42E + No of Bays1819202122L/Nose8N16N1+3N26N1+3N26N1+3N26N1+3N2Counterweight[20D + 6C][20D + 6C][20D + 6C][20D + 6C]Build E + 1with RRB at:1p21p21p21p21p2AddNote aNote aNote aNote aNote a2,32,32,32,32,37N1*,46N1*,46N1’*,46N1*,46N1*,4555558N1**,63N2**,63N2**,63N2**,63N2**,6(CG)(Ap2)(Bp2)(Bp2)(Bp2)(Bp2)Boom3p02p42p42p42p4Add7 thru 97 thru 97 thru 97 thru 97 thru 9(CG)(2p3)(2p0)(2p0)(2p0)(2p0)Boom4p54p24p24p24p2Add10+11+1210 thru 1310 thru 1310 thru 1310 thru 13(CG)(3p7)(4p0)(4p0)(4p0)(4p0)Boom10p711p011p011p011p0Add13 thru 1814 thru 1914 thru 2014 thru 2114 thru 22EE+[20D+6C]E+[20D+6C]E+[20D+6C]E+[20D+6C](CG)(8p4)(9p0)(9p7)(10p3)(10p7)Launch(8p4)(9p0)(9p7)(10p3)(10p7)Position LRPLZ 5LZ 2LZ 4LZ 5LZ 6Note bNote bNote bNote bNote bLaunch to15p516p517p518p519p5RemoveFRB,RRBFRB,RRBFRB,RRBFRB,RRBFRB,RRBComplete byNote c,dNote c,dNote c,dNote c,dNote c,dNOTES:a.Add LNCG posts, LNCG and nose roller.b.Check that LR is under LZ given or higher. Remove nose sections as they pass LRP, observing minimum 5ft (1.5 m) overhang. Leave last three nose sections in place until far bank end of bridge has been lowered toground.c.Launch until far bank end of bridge is 9 in (23 cm) from LRP, or end of ETP overhangs CRB by 1.5 ft (0.5 m).d.Put bridge on ground.*Add given length of launching nose with LRP secured with tie down strap.**Nose completed by adding 8th LNH or 6 LNH required for 3N2 (double-story nose).[ ]Counterweight.( )Center of gravity.6-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business