ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-22. (cont’d) Delaunch Table - 2E + 10 through 2E + 12 Bay Double Story(Restricted Site - Original Far Bank)Bridge ft9096102Length m27.429.331.12E + No. of Bays101112L/Nose6N17N17N18N17N18N1V Distanceft93939999105105m28.328.330.230.232.032.0Boom3p02p6RemoveTP8,BP7TP8 andTP7,BP6BP7(CG)(1p0)(1p2)Boom1p71p71p71p71p71p7RemoveTP6,BP5TP5,BP4TP7,BP6TP6,BP5TP7,BP6TP6,BP5TP5,BP47N1*TP6,BP58N1,TP5TP6,BP58N1,TP56N1TP5,BP4BP4,7N1TP5,BP4BP4,7N17N1*7N1*(CG)(1p3)(1p3)(1p3)(1p3)(1p3)(1p3)Boom2p02p02p02p02p02p0RemovePin at APin at APin at APin at APin at APin at ABoom1p41p41p41p41p41p4RemoveTP4TP4TP4TP4TP4TP43,BP23,BP23,BP23,BP23,BP23,BP2BoomBp0Bp0Bp0Bp0Bp0Bp0RemoveTP2,1TP2,1TP2,1TP2,1TP2,1TP2,1BoomBp2Bp2Bp2Bp2Bp2Bp2RemoveEEEEEEComplete byNote eNote eNote eNote eNote eNote eNOTES:a.Remove curbs, decks and ramps and position FRB under bridge min 1.5 ft (0.5 m) from end.b.Position center of LR (LRP) 8 ft (2.4 m) from BSB.c.Add LNCG posts, LNCG and nose roller. Add 3LNH. Re-position LRP [base 9 in (23 cm) from BSB].d.Add remaining nose sections as required, observing minimum 5 ft (1.5 m) overhang.e.Disassemble FRB and RRB. Clear site.*Remove entire launching nose, LNCG, LNCG posts and nose roller.( )Center of gravity.6-28
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business