ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 6-19. (cont’d) Delaunch Table - 2E + 10 through 2E + 12 Bay Double Story (Restricted Site)Bridge ft 90 96 102Length m 27.4 29.3 31.12E + No. of Bays 101112L/Nose 6N1 7N1 7N1 8N1 7N1 8N1V Distanceft 93 93 99 99 105 105m 28.3 28.3 30.2 30.2 32.0 32.0Boom 1p2 1p2 1p2 1p2 1p2 1p2Remove 4 5,4 8N1+4 5,4 8N1+4(CG) (Cp2) (Cp2) (Cp2) (Cp2) (Cp2)Remove 6N1* 7N1* 7N1* 7N1* 7N1* 7N1*3,2 3,2 3,2 3,2 3,2 3,2Boom Bp2 Bp2 Bp2 Bp2 Bp2 Bp2Remove 1,E 1,E 1,E 1,E 1,E 1,EComplete By: Note e Note e Note e Note e Note e Note eNOTES:a. Remove curbs, decks and ramps and position FRB under bridge min 1.5 ft (0.5 m) from the end.b. Position center of LR (in LRP) 8 ft (2.4 m) from BSB.c. Add LNCG posts, LNCG and nose roller. Add 3 LNH. Reposition LRP [base 9 in (23 cm) from BSB].d. Add remaining nose sections, observing minimum 5 ft (1.5 m ) overhang.e. Disassemble FRB and RRB. Clear site.* Remove entire launching nose, LNCG, LNCG posts and nose roller.( ) Center of gravity.6-23
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business