ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 6-21. (contd) Delaunch Table - 2E + 6 through 2E + 9 Bay Double Story
(Restricted Site-Original Far Bank)
Bridge ft
66
72
78
84
Length m
20.1
21.9
23.8
25.6
2E + No. Bays
6
7
8
9
L/Nose
5N1
6N1
5N1
6N1
6N1
7N1
6N1
7N1
V Distance ft
69
69
75
75
81
81
87
87
m
21.0
21.0
22.9
22.9
24.7
24.7
26.5
26.5
Boom
1p7
1p4
1p7
1p7
1p7
1p7
1p7
1p7
Remove
5N1*
6N1*
TP5,BP4
TP5,BP4
TP5,BP4
TP5,BP4
TP6,BP5
TP5,BP4
5N1*
6N1*
6N1*
7N1*
TP5,BP4
7N1*
6N1*
(CG)
(1p3)
(Ap2)
(1p3)
(1p3)
(1p3)
(1p3)
(1p3)
(1p3)
Boom
2p0
2p0
2p0
2p0
2p0
2p0
2p0
2p0
Remove
Pin at A
Pin at A
Pin at A
Pin at A
Pin at A
Pin at A
Pin at A
Pin at A
Boom
1p4
1 p4
1 p4
1p4
1p4
1 p4
1 p4
1p4
Remove
TP4
TP4
TP4
TP4
TP4
TP4
TP4
TP4
3,BP2
3,BP2
3,BP2
3,BP2
3,BP2
3,BP2
3,BP2
3,BP2
Boom
Bp0
Bp0
Bp0
Bp0
Bp0
Bp0
Bp0
Bp0
Remove
TP2,1
TP2,1
TP2,1
TP2,1
TP2,1
TP2,1
TP2,1
TP2,1
Boom
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Bp2
Remove
E
E
E
E
E
E
E
E
Complete by
Note e
Note e
Note e
Note e
Note e
Note e
Note e
Note e
NOTES:
a.
Remove curbs, decks and ramps and position FRB under bridge min 1.5 ft (0.5 m) from end.
b.
Position center of LR (LRP) 8 ft (2.4 m) from BSB.
c.
Add LNCG posts, LNCG and nose roller. Add 3LNH. Re-position LRP [base 9 in (23 cm) from BSB].
d.
Add remaining nose sections as required, observing minimum 5 ft (1.5 m) overhang.
e.
Disassemble FRB and RRB. Clear site.
*
Remove entire launching nose, LNCG, LNCG posts and nose roller.
( )
Center of gravity.
6-26