ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1Section II. NORMAL SITES6-1.ASSEMBLY- DOUBLE STORY - 2E + 12 BAYa.Set up and align roller beams(1)Assemble front roller beam (FRB) and rear roller beam (RRB) and position on site (para. 4-5b.).(2)Ensure roller beams are level.b.AssemblyNOTEThroughout bridge assembly the NCOIC must monitor the height and level of roller beams. Theheight must be set to achieve an acceptable working height. Roller beams must be level so thatcomponents connect/disconnect properly.(1)Assemble end of bridge (EOB) and first bay (para. 4-8).(2)Position extended jack vertically in Mk1 landing roller pedestal and place closed landing roller pedestaland landing roller next to front roller beam.(3)Fit nose roller to bankseat beam (para. 4-10).6-29
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business