ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(7)Move rear roller beam close to packing, jack up rear roller beam, remove packing and lower rear rollerbeam.(8)Add further bays until CG is within 1pp of rear roller beam, or until reactions on baseplates are as muchas existing bridge can sustain.E + No of bayscompleted123456789101112Bp3Bp01p11p52p12p53p13p54p14p55p15p5(9)Repeat process of adding bays, packing up, and moving rear roller beam until bridge girders arecomplete (including end of bridge).(10) Jack up rear of bridge as needed to remove rear roller beam and to position required packing.(11) Repeat (10) for front end of bridge.(12) Place ramps, deck, curbs, guide markers, and classification signs.(13) Clear site of all erection equipment.6-71
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business