ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(2)Attach anchorage lug to end of each pin and secure with a retaining pin and retainer clip.NOTEBridge must be boomed until anchorage pin is in front of roller beam nearest edge of gap, beforelug can be attached.(3)Attach loop of approach guy cable to lug with bracing pin and secure with retainer clip.6-74
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business