ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(9)
Position chain holdfasts on site as shown. Drive nine pickets through links of each holdfast.
(10) After bridge is lowered to ground, remove and unroll coil(s) of cable(s) from top panels and stretch out
toward holdfasts.
(11) Feed running end of cable through link of chain holdfast and take up slack by hand.
6-76