ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 7-2. (contd) Building and Boom Table - 2E + 18 through 2E + 22 Bay Link Reinforced (Normal Site)
Bridge ft
138
144
150
156
162
Length m
42.1
43.9
45.7
47.6
49.4
2E+No. of Bays
18
19
20
21
22
L/Nose
6N1+3N2
6N1+3N2
6N1+3N2
6N1+3N2
6N1+3N2
Counterweight
[8D]
[20D+6C]
[30D+6C]
[40D+6C]
Launch
15p0
15p0
Add
[27D+6C]
[37D+6C]
Launch
15p5
16p5
17p5
18p5
19p5
Add
PT
PT
PT
PT
PT
Remove
RRB
RRB
RRB
RRB
RRB
Launch
18p2
19p2
20p2
21p2
22p2
Add
AA(S)
AA(S)
AA(S)
AA(S)
AA(S)
Remove
FRB
FRB
FRB
FRB
FRB
Launch
Dp2
Dp2
Dp2
Dp2
Dp2
Add
AA(L)
AA(L)
AA(L)
AA(L)
AA(L)
Complete by:
Note d,e,f,g
Note d,e,f,g
Note d,e,f,g
Note d,e,f,g
Note d,e,f,g
NOTES:
a.
Add LNCG posts, LNCG and nose roller.
b.
Stop boom/launch to add long or short links, light tackle and anti-flutter as required.
c.
Check that LR is under LZ given or higher. Remove nose sections as they pass LRP, observing minimum 5
ft (1.5 m) overhang. Leave last three nose sections in place until far bank end of bridge has been lowered to
ground.
d.
Boom to 6 ft (1.8 m) from A peg or ETP overhangs CRB by min. 1.5 ft (0.5 m).
e.
Install ex FRB in front of CRB and then reposition LRP 12 ft (3.6 m) from A peg.
f.
Launch to required far bank bearing or until end of ETP overhangs ex FRB by 1.5 ft (0.5 m).
g.
Reposition counterweight deck units to final position and put bridge on ground.
*
Add given length of launching nose with LRP secured with tie-down strap.
**
Nose completed by adding further LNHs.
[ ]
Counterweight.
( )
Center of gravity.
7-5